Various works (for public works and buildings) (France)
Specialist construction work
The description below corresponds to the share of each subclass of branch F43 (in % of turnover)
- Demolition and site preparation (8%) Demolition work (12%)
- Demolition work (12%)
- Site preparation work (85%)
- Drilling and boring (3%)
- Electrical, plumbing and other installation work (37%)
- Electrical installation (45%)
- Plumbing, heating and air conditioning (42%)
- Other installation work (13%)
- Finishing work (26%)
- Plastering work (11%)
- Joinery work (54%)
- Floor and wall covering work (13%)
- Painting and glazing (19%)
- Other finishing work (3%)
- Other specialist construction work (29%)
- Roofing work (18%)
- Other specialised construction work n.e.c. (82%)
How is this figure calculated?
To find out more about this rule in our model, run the calculation by clicking on the button below.
Calculate your climate footprint in just 10 minutes .